j Welcome to SS Labs India
loader

PLC TRAINER KIT

Specifications:
  • This equipment should consists of
  • Delta make plc model of SS2 is provided with all input and output Connections are brought out for necessary connections.
  • In this kit we are providing 8 digital inputs and 6 digital outputs.
  • One RS 232 cable is provided for communication with PC.
  • Along with the kit one software and sample programs are provided. A DC 24 V is provided for sample module connection

IA-01: SAP Module -Logic gate simulation

Specifications:
  • This equipment should consists of
  • One selector switch is provided for logic gate selection.
  • Two push button switches are provided for inputs to the gate.
  • Two led’s given for output indication.
  • Binding posts of 4mm are provided for input and output connections from the PLC

IA-03: SAP Module –Boolean algebra simulation

Specifications:
  • This equipment should consists of
  • Six push button switches are provided for inputs to the 1st and 2nd law of Boolean algebra.
  • Four led’s are given for output indication.
  • Binding posts of 4mm are provided for input and output connections from the PLC.

IA-04: SAP Module –On delay Off delay with timer simulation

Specifications:
  • This equipment should consists of
  • Two push button switches are provided for inputs to the on delay and off Delay timers.
  • Two led’s given for output indication.
  • Binding posts of 4mm are provided for input and output connections from the PLC

IA-06: SAP Module –Timer circuits simulation

Specifications:
  • This equipment should consists of
  • Two toggle switches are provided for inputs to the on delay and off Delay timers.
  • Two led’s given for output indication.
  • Binding posts of 4mm are provided for input and output connections from the PLC.

IA-07: SAP Module –Counter and comparison simulation

Specifications:
  • This equipment should consists of
  • Two push button switches are provided for inputs to the up and down counter.
  • Two led’s given for output indication.
  • Binding posts of 4mm are provided for input and output connections from the PLC

IA-08: SAP Module –Staircase light and Counting of pulse simulation

Specifications:
  • This equipment should consists of
  • Two toggle switches are provided for inputs to the staircase light, One push button for counting of pulse are provided.
  • Three led’s given for output indication.
  • Binding posts of 4mm are provided for input and output connections from the PLC

IA-09: SAP Module –Traffic light simulation

Specifications:
  • This equipment should consists of
  • One toggle switch is provided for cycle on/off.
  • Six led’s given for output indication with three different colors.
  • Binding posts of 4mm are provided for input and output connections from the PLC

IA-10: SAP Module –Water level controller simulation

Specifications:
  • This equipment should consists of
  • Two push buttons are provided for motor on and over tank full indication.
  • Two toggle switches are provided for sump high/low and over tank low indication.
  • One led is given for on indication of motor.
  • Binding posts of 4mm are provided for input and output connections from the PLC

IA-11: SAP Module –Temperature control system simulation

Specifications:
  • This equipment should consists of
  • Two push buttons are provided for power on and temperature sensing.
  • One led is given for on indication of heater.
  • Binding posts of 4mm are provided for input and output connections from the PLC

IA-12: SAP Module –DOL starter simulation

Specifications:
  • This equipment should consists of
  • Two push buttons are provided for motor on and motor off.
  • One led is given for on indication of motor.
  • Binding posts of 4mm are provided for input and output connections from the PLC

IA-13: SAP Module –Star Delta starter simulation

Specifications:
  • This equipment should consists of
  • Two push buttons are provided for motor on and motor off.
  • Three output led’s are given for indication of main relay, star relay and delta relay.
  • Binding posts of 4mm are provided for input and output connections from the PLC

IA-14: SAP Module –Conveyer control simulation

Specifications:
  • This equipment should consists of
  • Three push buttons are provided for sensing input of load bottle, sense Bottle and unload the bottle.
  • Three output led’s are given for indication of conveyer on, bottle filling And cap fitting.
  • Binding posts of 4mm are provided for input and output connections from the PLC

IA-15: SAP Module –Lift control simulation

Specifications:
  • This equipment should consists of
  • Four push buttons are provided for sensing input of ground, 1st,2nd and3rd floor.
  • Four output led’s given for indication of arriving floor indication.
  • Binding posts of 4mm are provided for input and output connections from the PLC

IA-16: SAP Module –Stepper motor control simulation

Specifications:
  • This equipment should consists of
  • Three push buttons are provided for motor on, off and direction.
  • Three output led’s given for indication of enable, direction and clock.
  • Binding posts of 4mm are provided for input and output connections from the PLC